Commercial building Kotermaa 8
Address: Kotermaa 8, Tallinn, Harju County
Area: 2 680 m²
Year: 2022-2023, amendments made 2025
Status: Under construction
Client: Astlanda Ehitus
Lead Designer: Allianss Architects
Architecture: Allianss Architects
Landscape Architecture: Allianss Architects and Pihamaa Stuudio
The design brief was to create a distinctive and representative outdoor-space solution that complied with sustainable design principles and the detailed spatial plan.
The landscape design concept, “Wave”, was inspired by the undulating geometry of the proposed commercial building’s façade, which was echoed in the planting design. The wave symbolises water: the property is located in an area where seasonal periods of excess moisture need to be taken into account. It also symbolises heat: reflected heat from hard surfaces creates heatwave-like conditions in some planting areas during the warmest part of the year. Laine (Wave in English) is also an elegant female name in Estonian, and for this reason white, complemented by a small amount of silver, was selected as the dominant colour scheme for the planting. Autumn colour is absent or limited to subtle light-yellow tones.
A representative raised planting area combined with seating was designed in front of the main entrance to the commercial building. Growing conditions there are in places extremely dry and hot, and therefore sun-loving, drought-tolerant plants suited to dry conditions were selected for the raised planting area. On the side facing the main road, an avenue of trees was introduced to provide vertical green volume and balance the scale of the building. Along the internal street within the urban block, planting was designed with the rhythm of an avenue, while using a more diverse species composition than a conventional single-species avenue in order to respond to the variable growing conditions, which range from drier to wetter areas. A snow storage area was also planned there. The plant species were selected to tolerate both de-icing salts and temporarily waterlogged conditions.
Wherever possible, environmentally responsible solutions were incorporated into the design, including on-site storage and infiltration of winter snow and partially vegetated parking spaces.
One of the main challenges of the project was a discrepancy between the landscaping requirements set out in the comprehensive plan and the detailed spatial plan. This caused considerable uncertainty, and the most appropriate solution was ultimately reached through negotiation.
In 2025, a design amendment was prepared. The geometry of the planting area in front of the building was revised due to an increase in the number of parking spaces, which also made it possible to improve the seating area and orient views towards the representative entrance area. The location of the car park entrance was changed, which in turn required the woodland planting area and the snow storage area to be reduced. Following the removal of the loading access originally designed on the northern side of the building, additional vertical planting volume was introduced alongside the building to create a more balanced composition.
The scope of work covered the planting design component of the landscape architecture project. A concept design and detailed design were prepared, followed by a design amendment in 2025.



